Establishment unit data
In general | |||
Enterprise number: | 0550.439.960 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.314.033.879 | ||
Status of the establishment unit: | Active | ||
Start date: | January 1, 2021 | ||
Name of the establishment unit: |
Bauunternehmen LEYENS Walter & Sohn Name in German, since January 1, 2021 | ||
Address of the establishment unit: |
Zur Domäne 81
4750 Bütgenbach Since January 1, 2021 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 41.201
- General construction of residential buildings Since January 1, 2021 | |||
Main activity: 71.11302
- Design of gardens, parks, etc. Since December 12, 2023 | |||
Main activity: 81.300
- Landscape service activities Since December 12, 2023 | |||
Additional activity: 25.120
- Manufacture of doors and windows of metal Since January 1, 2021 | |||
Additional activity: 41.20102
- Construction of individual "turnkey" houses Since January 1, 2021 | |||
Additional activity: 41.20111
- Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since January 1, 2021 | |||
Additional activity: 41.20112
- Realisation of "turnkey" apartments Since January 1, 2021 | |||
Additional activity: 41.20121
- Realisation of the structural work of buildings Since January 1, 2021 | |||
Additional activity: 41.20122
- General coordination on the construction site Since January 1, 2021 | |||
Additional activity: 41.203
- General construction of other non-residential buildings Since January 1, 2021 | |||
Additional activity: 41.20301
- Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc. Since January 1, 2021 | |||
Additional activity: 41.20302
- Assembly of hangars, barns, silos, etc., for agricultural use Since January 1, 2021 | |||
Additional activity: 42.911
- Dredging works Since January 1, 2021 | |||
Additional activity: 42.91101
- Realisation of dredging works Since January 1, 2021 | |||
Additional activity: 42.91905
- Construction of settling ponds and other structures for waste water treatment Since January 1, 2021 | |||
Additional activity: 43.120
- Site preparation works Since January 1, 2021 | |||
Additional activity: 43.12001
- Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since January 1, 2021 | |||
Additional activity: 43.12003
- Lowering of the water table and drainage of construction sites Since January 1, 2021 | |||
Additional activity: 43.320
- Joinery works Since January 1, 2021 | |||
Additional activity: 43.32001
- Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since January 1, 2021 | |||
Additional activity: 43.32003
- Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since January 1, 2021 | |||
Additional activity: 43.32004
- Assembly of wooden or plastic armoured doors and firewall doors Since January 1, 2021 | |||
Additional activity: 43.32005
- Assembly of wooden or plastic greenhouses, verandas etc. Since January 1, 2021 | |||
Additional activity: 43.32011
- Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since January 1, 2021 | |||
Additional activity: 43.32013
- Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since January 1, 2021 | |||
Additional activity: 43.32014
- Assembly of metal armoured doors and fire doors Since January 1, 2021 | |||
Additional activity: 43.32015
- Assembly of metal greenhouses, verandas, etc. Since January 1, 2021 | |||
Additional activity: 43.331
- Tiling of floors and walls Since January 1, 2021 | |||
Additional activity: 43.33101
- Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc. Since January 1, 2021 | |||
Additional activity: 43.99301
- Construction of decorative fireplaces and open fireplaces Since January 1, 2021 | |||
Additional activity: 43.99401
- Masonry Since January 1, 2021 | |||
Additional activity: 43.99601
- Screed laying Since January 1, 2021 | |||
Additional activity: 43.999
- Other specialised construction activities Since January 1, 2021 | |||
Additional activity: 43.99902
- Formwork and rebar work Since January 1, 2021 | |||
Additional activity: 43.99903
- Construction of chimneys and industrial ovens Since January 1, 2021 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2008(1) | |||
Main activity: 41.201
- General construction of residential buildings Since January 1, 2021 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2025(1) | |||
Main activity: 41.001
- General construction of residential buildings Since January 1, 2025 |
|
(1)Activities are registered in the CBE using NACE-BEL codes (Belgian classification of activities). There are different versions of these codes. Activities with a NACE-BEL code (version 2003) were stopped on 31/12/2007 and automatically converted to the new NACE-BEL codes (2008 version) starting on 01/01/2008. A new 2025 version of the codes will enter into force on 01/01/2025. During the first half of the year 2025, all activities with a 2008 version of the NACE-BEL code will be phased out with 31/12/2024 as end date and automatically converted to the 2025 version of the NACE-BEL codes, starting on 01/01/2025. Up until then, activities will continue to be registered using the 2008 NACE-BEL codes.