Establishment unit data
In general | |||
Enterprise number: | 0646.940.114 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.250.102.466 | ||
Status of the establishment unit: | Active | ||
Start date: | January 25, 2016 | ||
Name of the establishment unit: |
CONTEXT- rg Name in Dutch, since January 25, 2016 | ||
Address of the establishment unit: |
Leopold I-laan 11
8000 Brugge Since January 25, 2016 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 16.100 - Sawmilling and planing of wood Since January 25, 2016 | |||
Main activity: 16.10001 - Sawmilling, planing and processing of wood Since January 25, 2016 | |||
Main activity: 25.50102 - Production and assembly of forged parts for construction: stair railings, balustrades, etc. Since January 25, 2016 | |||
Main activity: 25.61005 - Colouring, engraving, printing of metal Since January 25, 2016 | |||
Main activity: 33.11001 - Repair and maintenance of domestic boilers Since January 25, 2016 | |||
Main activity: 41.201 - General construction of residential buildings Since January 25, 2016 | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since January 25, 2016 | |||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since January 25, 2016 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since January 25, 2016 | |||
Main activity: 41.20112 - Realisation of "turnkey" apartments Since January 25, 2016 | |||
Main activity: 41.20121 - Realisation of the structural work of buildings Since January 25, 2016 | |||
Main activity: 41.20122 - General coordination on the construction site Since January 25, 2016 | |||
Main activity: 43.11001 - Demolition of buildings and other constructions Since January 25, 2016 | |||
Main activity: 43.12011 - Clearing of building sites Since January 25, 2016 | |||
Main activity: 43.21101 - Installation of electrical wiring and fittings Since January 25, 2016 | |||
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities Since January 25, 2016 | |||
Main activity: 43.221 - Plumbing works Since January 25, 2016 | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since January 25, 2016 | |||
Main activity: 43.22211 - Installation of electrical heating systems Since January 25, 2016 | |||
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since January 25, 2016 | |||
Main activity: 43.29904 - General installation work Since January 25, 2016 | |||
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since January 25, 2016 | |||
Main activity: 43.320 - Joinery works Since January 25, 2016 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since January 25, 2016 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since January 25, 2016 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since January 25, 2016 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since January 25, 2016 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since January 25, 2016 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since January 25, 2016 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since January 25, 2016 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since January 25, 2016 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since January 25, 2016 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since January 25, 2016 | |||
Main activity: 43.331 - Tiling of floors and walls Since January 25, 2016 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since January 25, 2016 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since January 25, 2016 | |||
Main activity: 43.34101 - Interior and exterior painting of buildings Since January 25, 2016 | |||
Main activity: 43.34201 - Painting of metal frames Since January 25, 2016 | |||
Main activity: 43.34301 - Fitting of glass, mirrors, etc. Since January 25, 2016 | |||
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work Since January 25, 2016 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since January 25, 2016 | |||
Main activity: 43.91001 - Framework assembly Since January 25, 2016 | |||
Main activity: 43.91002 - Covering work using all materials Since January 25, 2016 | |||
Main activity: 43.91003 - Installation of draining elements for rainwater Since January 25, 2016 | |||
Main activity: 43.99101 - Waterproofing of roofs and roof terraces Since January 25, 2016 | |||
Main activity: 43.99111 - Treatment of walls with water repellent products Since January 25, 2016 | |||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since January 25, 2016 | |||
Main activity: 43.99401 - Masonry Since January 25, 2016 | |||
Main activity: 43.99402 - Execution of repointing Since January 25, 2016 | |||
Main activity: 43.99601 - Screed laying Since January 25, 2016 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since January 25, 2016 | |||
Main activity: 43.99902 - Formwork and rebar work Since January 25, 2016 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since January 25, 2016 | |||
Main activity: 71.11103 - Supervision of construction work (structural work, installation, finishing work, etc.) Since January 25, 2016 | |||
Main activity: 71.11104 - Operation of major maintenance of buildings Since January 25, 2016 | |||
Main activity: 71.121 - Engineering and technical consultancy activities, except surveying activities Since January 25, 2016 | |||
Main activity: 71.12101 - Design and realisation of projects relating to electrical and electronic engineering; mining, chemical, mechanical and industrial engineering, systems engineering, security techniques, etc. Since January 25, 2016 | |||
Main activity: 71.12102 - Industrial design Since January 25, 2016 | |||
Main activity: 71.12103 - Development of projects involving acoustic engineering, air conditioning, refrigeration, sanitation and pollution control, etc. Since January 25, 2016 | |||
Main activity: 71.12104 - Elaboration of projects involving activities relating to civil or structural engineering, hydraulic engineering and traffic engineering Since January 25, 2016 | |||
Main activity: 71.12106 - Geodetic survey activities: hydro graphic, underground, boundary survey; mapping and geographic data collection activities, including aerial photography, etc. Since January 25, 2016 |
| ||
No data included in CBE. |
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.