shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0671.467.553
Status of the entity:Active
Number of the establishment unit:2.261.562.621
Status of the establishment unit:Active
Start date:February 14, 2017
Name of the establishment unit: GWL+
Name in Dutch, since February 14, 2017
Address of the establishment unit:
Ruiterstraat   103
3930   Hamont-Achel
Since February 1, 2020
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 42.110 - Construction of roads and motorways
Since February 14, 2017
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers)
Since February 14, 2017
Main activity: 42.212 - Construction of drainage systems for waste water
Since February 14, 2017
Main activity: 42.21901 - Drilling and water well construction, shaft sinking
Since February 14, 2017
Main activity: 42.21912 - Construction of networks to transport gas, petroleum products, etc.
Since February 14, 2017
Main activity: 42.99001 - Construction of playgrounds and sports fields, swimming pools, etc.
Since February 14, 2017
Main activity: 43.120 - Site preparation works
Since February 14, 2017
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc.
Since February 14, 2017
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites
Since February 14, 2017
Main activity: 43.12011 - Clearing of building sites
Since February 14, 2017
Main activity: 43.13002 - Execution of horizontal drilling for cable glands or ducts
Since February 14, 2017
Main activity: 43.211 - Electrotechnical installation work for buildings
Since February 14, 2017
Main activity: 43.212 - Electrotechnical installation work other than buildings
Since February 14, 2017
Main activity: 43.291 - Insulation works
Since February 14, 2017
Main activity: 43.39002 - Other building completion and finishing work n.e.s.
Since February 14, 2017
Main activity: 43.992 - Restoration of façades
Since February 14, 2017
Main activity: 43.99402 - Execution of repointing
Since February 14, 2017
Main activity: 46.731 - Wholesale trade of construction materials, general assortment
Since February 14, 2017
Main activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities
Since February 14, 2017
 
 

Version of the Nacebel codes for the NSSO-activities 2008(1)

Main activity: 43.120 - Site preparation works
Since March 6, 2017
 
 

(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.