Attention! This establishment unit has been stopped. Therefore, the shown data reflect the situation at the moment of cessation of the establishment unit.
Establishment unit data
In general | |||
Enterprise number: | 0674.464.160 | ||
Status of the entity: | Stopped | ||
Number of the establishment unit: | 2.263.131.645 | ||
Status of the establishment unit: | Stopped Since October 1, 2024 | ||
Start date: | January 2, 2017 | ||
Name of the establishment unit: | No information found in the CBE. | ||
Address of the establishment unit: |
Kapelleweg 6
8700 Tielt Since January 2, 2017 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since January 1, 2019 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since January 1, 2019 | |||
Main activity: 41.20121 - Realisation of the structural work of buildings Since January 1, 2019 | |||
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers) Since January 2, 2017 | |||
Main activity: 43.120 - Site preparation works Since January 2, 2017 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since January 2, 2017 | |||
Main activity: 43.12011 - Clearing of building sites Since January 2, 2017 | |||
Main activity: 43.291 - Insulation works Since January 2, 2017 | |||
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since January 2, 2017 | |||
Main activity: 43.29102 - Insulation work for heating or cooling pipes Since January 2, 2017 | |||
Main activity: 43.29103 - Insulation work for cold storage or refrigerated warehouses Since January 2, 2017 | |||
Main activity: 43.29901 - Installation of blinds and awnings Since January 2, 2017 | |||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since January 2, 2017 | |||
Main activity: 43.320 - Joinery works Since January 1, 2019 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since January 1, 2019 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since January 1, 2019 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since January 2, 2017 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since January 1, 2019 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since January 2, 2017 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since January 1, 2019 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since January 1, 2019 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since January 1, 2019 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since January 1, 2019 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since January 1, 2019 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since January 1, 2019 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since January 1, 2019 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since January 1, 2019 | |||
Main activity: 43.33201 - Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings Since January 1, 2019 | |||
Main activity: 43.390 - Other finishing work Since January 1, 2019 | |||
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work Since January 2, 2017 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since January 2, 2017 | |||
Main activity: 43.910 - Roofing works Since January 1, 2019 | |||
Main activity: 43.91001 - Framework assembly Since January 1, 2019 | |||
Main activity: 43.91002 - Covering work using all materials Since January 1, 2019 | |||
Main activity: 43.91003 - Installation of draining elements for rainwater Since January 1, 2019 | |||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since January 2, 2017 | |||
Main activity: 43.994 - Masonry and repointing Since January 1, 2019 | |||
Main activity: 43.99401 - Masonry Since January 1, 2019 | |||
Main activity: 43.99402 - Execution of repointing Since January 2, 2017 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since January 1, 2019 | |||
Main activity: 43.99902 - Formwork and rebar work Since January 1, 2019 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since January 1, 2019 | |||
Main activity: 43.99905 - Execution of lifting work for third parties Since January 1, 2019 | |||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since January 1, 2019 | |||
Main activity: 81.220 - Other building and industrial cleaning activities Since January 2, 2017 | |||
Main activity: 81.22001 - Interior cleaning of buildings of all types: offices, factories, workshops, premises of institutions and other premises for commercial or professional use, apartment buildings, etc. Since January 2, 2017 | |||
Main activity: 81.30001 - Pruning of trees and hedges Since January 2, 2017 | |||
Main activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities Since January 2, 2017 |
|
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.