Establishment unit data
In general | |||
Enterprise number: | 0765.552.704 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.315.657.541 | ||
Status of the establishment unit: | Active | ||
Start date: | March 23, 2021 | ||
Name of the establishment unit: |
Algemene Bouwwerken Daeninck Name in Dutch, since March 23, 2021 | ||
Address of the establishment unit: |
Kouterwegel 98
9160 Lokeren Since March 23, 2021 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 41.101 - Residential property development Since March 23, 2021 | |||
Main activity: 41.10101 - Real estate development of new residential houses or renovations Since March 23, 2021 | |||
Main activity: 41.102 - Non-residential property development Since March 23, 2021 | |||
Main activity: 41.10212 - Development or renovation of urban areas by promotion Since March 23, 2021 | |||
Main activity: 41.201 - General construction of residential buildings Since March 23, 2021 | |||
Main activity: 41.202 - General construction of office buildings Since March 23, 2021 | |||
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use Since March 23, 2021 | |||
Main activity: 43.110 - Demolition works Since March 23, 2021 | |||
Main activity: 43.120 - Site preparation works Since March 23, 2021 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since March 23, 2021 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since March 23, 2021 | |||
Main activity: 43.212 - Electrotechnical installation work other than buildings Since March 23, 2021 | |||
Main activity: 43.291 - Insulation works Since March 23, 2021 | |||
Main activity: 43.299 - Other installation works n.e.c. Since March 23, 2021 | |||
Main activity: 43.310 - Plastering works Since March 23, 2021 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since March 23, 2021 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since March 23, 2021 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since March 23, 2021 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since March 23, 2021 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since March 23, 2021 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since March 23, 2021 | |||
Main activity: 43.331 - Tiling of floors and walls Since March 23, 2021 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since March 23, 2021 | |||
Main activity: 43.390 - Other finishing work Since March 23, 2021 | |||
Main activity: 43.910 - Roofing works Since March 23, 2021 | |||
Main activity: 43.992 - Restoration of façades Since March 23, 2021 | |||
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces Since March 23, 2021 | |||
Main activity: 43.994 - Masonry and repointing Since March 23, 2021 | |||
Main activity: 43.996 - Screed laying Since March 23, 2021 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since March 23, 2021 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2008(1) | |||
Main activity: 41.201 - General construction of residential buildings Since June 17, 2024 |
|
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.