shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0784.676.748
Status of the entity:Active
Number of the establishment unit:2.337.830.157
Status of the establishment unit:Active
Start date:April 8, 2022
Name of the establishment unit: RD RENOV
Name in French, since April 8, 2022
Address of the establishment unit:
Boulevard du Midi(F-E)   62  box 1
6140   Fontaine-l'Evêque
Since July 4, 2023
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 33.140 - Repair of electrical equipment
Since April 8, 2022
Main activity: 33.20011 - Installation of back-up power systems (generators)
Since April 8, 2022
Main activity: 41.101 - Residential property development
Since December 19, 2023
Main activity: 41.201 - General construction of residential buildings
Since December 19, 2023
Main activity: 41.202 - General construction of office buildings
Since December 19, 2023
Main activity: 43.211 - Electrotechnical installation work for buildings
Since April 8, 2022
Main activity: 43.21101 - Installation of electrical wiring and fittings
Since April 8, 2022
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities
Since April 8, 2022
Main activity: 43.21103 - Installation of surveillance and alarm systems against intruders
Since April 8, 2022
Main activity: 43.212 - Electrotechnical installation work other than buildings
Since April 8, 2022
Main activity: 43.222 - Installation of heating, ventilation and air conditioning
Since December 19, 2023
Main activity: 43.291 - Insulation works
Since April 8, 2022
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation
Since April 8, 2022
Main activity: 43.29102 - Insulation work for heating or cooling pipes
Since April 8, 2022
Main activity: 43.29103 - Insulation work for cold storage or refrigerated warehouses
Since April 8, 2022
Main activity: 43.299 - Other installation works n.e.c.
Since December 19, 2023
Main activity: 43.29902 - Installation of signs, illuminated or not
Since April 8, 2022
Main activity: 43.29911 - Installation of lifts and escalators
Since April 8, 2022
Main activity: 43.310 - Plastering works
Since December 19, 2023
Main activity: 43.320 - Joinery works
Since December 19, 2023
Main activity: 43.331 - Tiling of floors and walls
Since December 19, 2023
Main activity: 43.332 - Fitting of wood coverings for floors and walls
Since December 19, 2023
Main activity: 43.341 - Painting of buildings
Since December 19, 2023
Main activity: 43.390 - Other finishing work
Since December 19, 2023
Main activity: 43.910 - Roofing works
Since December 19, 2023
Main activity: 43.91001 - Framework assembly
Since December 19, 2023
 
 

Version of the Nacebel codes for the NSSO-activities 2008(1)

Main activity: 43.995 - Building restoration works
Since October 3, 2022
 
 

(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.