Establishment unit data
In general | |||||
Enterprise number: | 0786.906.461 | ||||
Status of the entity: | Active | ||||
Number of the establishment unit: | 2.332.481.695 | ||||
Status of the establishment unit: | Active | ||||
Start date: | June 8, 2022 | ||||
Name of the establishment unit: |
A MA CONCEPTION Name in French, since June 8, 2022 | ||||
Address of the establishment unit: |
Rue Hodister 42
box D
4860 Pepinster Since June 8, 2022 | ||||
Phone number: |
| ||||
Fax: | No information found in the CBE. | ||||
Email address: | No information found in the CBE. | ||||
Web address: | No information found in the CBE. | ||||
| |||||
Authorisations | |||||
No data included in CBE. | |||||
| |||||
Version of Nacebel codes for activities 2008(1) | |||||
Main activity: 43.120 - Site preparation works Since June 8, 2022 | |||||
Main activity: 43.211 - Electrotechnical installation work for buildings Since June 8, 2022 | |||||
Main activity: 43.221 - Plumbing works Since June 8, 2022 | |||||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since June 8, 2022 | |||||
Main activity: 43.291 - Insulation works Since June 8, 2022 | |||||
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since June 8, 2022 | |||||
Main activity: 43.299 - Other installation works n.e.c. Since June 8, 2022 | |||||
Main activity: 43.310 - Plastering works Since June 8, 2022 | |||||
Main activity: 43.320 - Joinery works Since June 8, 2022 | |||||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since June 8, 2022 | |||||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since June 8, 2022 | |||||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since June 8, 2022 | |||||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since June 8, 2022 | |||||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since June 8, 2022 | |||||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since June 8, 2022 | |||||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since June 8, 2022 | |||||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since June 8, 2022 | |||||
Main activity: 43.32031 - Assembly of gypsum drywalls Since June 8, 2022 | |||||
Main activity: 43.331 - Tiling of floors and walls Since June 8, 2022 | |||||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since June 8, 2022 | |||||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since June 8, 2022 | |||||
Main activity: 43.34101 - Interior and exterior painting of buildings Since June 8, 2022 | |||||
Main activity: 43.910 - Roofing works Since June 8, 2022 | |||||
Main activity: 43.994 - Masonry and repointing Since June 8, 2022 | |||||
Main activity: 43.99401 - Masonry Since June 8, 2022 | |||||
Main activity: 43.99402 - Execution of repointing Since June 8, 2022 | |||||
Main activity: 43.995 - Building restoration works Since June 8, 2022 | |||||
Main activity: 43.996 - Screed laying Since June 8, 2022 | |||||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since June 8, 2022 | |||||
Additional activity: 41.201 - General construction of residential buildings Since June 8, 2022 | |||||
Additional activity: 41.20101 - Realisation of the main structure of individual houses Since June 8, 2022 | |||||
Additional activity: 41.20102 - Construction of individual "turnkey" houses Since June 8, 2022 | |||||
Additional activity: 41.20121 - Realisation of the structural work of buildings Since June 8, 2022 | |||||
Additional activity: 41.20122 - General coordination on the construction site Since June 8, 2022 | |||||
Additional activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since June 8, 2022 | |||||
Additional activity: 43.29901 - Installation of blinds and awnings Since June 8, 2022 | |||||
Additional activity: 43.29902 - Installation of signs, illuminated or not Since June 8, 2022 | |||||
Additional activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since June 8, 2022 |
|
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.