Attention! This establishment unit has been stopped. Therefore, the shown data reflect the situation at the moment of cessation of the establishment unit.
Establishment unit data
In general | |||
Enterprise number: | 0677.885.488 | ||
Status of the entity: | Stopped | ||
Number of the establishment unit: | 2.267.737.561 | ||
Status of the establishment unit: | Stopped Since June 21, 2023 | ||
Start date: | July 4, 2017 | ||
Name of the establishment unit: |
BV-Bouw Name in Dutch, since April 2, 2019 | ||
Address of the establishment unit: |
Juliaan Dillensstraat 70
2018 Antwerpen Since September 10, 2021 Ex officio striked off address since March 3, 2022(1) | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(2) | |||
Main activity: 41.203 - General construction of other non-residential buildings Since April 2, 2019 | |||
Main activity: 43.291 - Insulation works Since April 2, 2019 | |||
Main activity: 43.320 - Joinery works Since April 2, 2019 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since April 2, 2019 | |||
Additional activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since April 2, 2019 | |||
Additional activity: 43.12003 - Lowering of the water table and drainage of construction sites Since April 2, 2019 | |||
Additional activity: 43.12011 - Clearing of building sites Since April 2, 2019 | |||
Additional activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since April 2, 2019 | |||
Additional activity: 43.29904 - General installation work Since April 2, 2019 | |||
Additional activity: 43.910 - Roofing works Since April 2, 2019 | |||
Additional activity: 43.91001 - Framework assembly Since April 2, 2019 | |||
Additional activity: 43.91002 - Covering work using all materials Since April 2, 2019 | |||
Additional activity: 43.91003 - Installation of draining elements for rainwater Since April 2, 2019 | |||
Additional activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since April 2, 2019 | |||
Additional activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since April 2, 2019 | |||
Additional activity: 82.990 - Other business support service activities n.e.c. Since April 2, 2019 |
|
(1)When an address is ex officio striked off, this indicates that the entity, the establishment unit or the branch is not longer situated at the registered address.
(2)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.