Establishment unit data
In general | |||||
Enterprise number: | 0640.995.004 | ||||
Status of the entity: | Active | ||||
Number of the establishment unit: | 2.246.601.360 | ||||
Status of the establishment unit: | Active | ||||
Start date: | October 15, 2015 | ||||
Name of the establishment unit: | No information found in the CBE. | ||||
Address of the establishment unit: |
Generaal Lemanstraat 17
1600 Sint-Pieters-Leeuw Since July 24, 2023 | ||||
Phone number: |
| ||||
Fax: | No information found in the CBE. | ||||
Email address: |
| ||||
Web address: |
| ||||
| |||||
Authorisations | |||||
No data included in CBE. | |||||
| |||||
Version of Nacebel codes for activities 2008(1) | |||||
Main activity: 33.140 - Repair of electrical equipment Since July 1, 2019 | |||||
Main activity: 41.201 - General construction of residential buildings Since September 16, 2020 | |||||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since July 1, 2019 | |||||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since July 1, 2019 | |||||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since July 1, 2019 | |||||
Main activity: 41.20112 - Realisation of "turnkey" apartments Since July 1, 2019 | |||||
Main activity: 41.20121 - Realisation of the structural work of buildings Since July 1, 2020 | |||||
Main activity: 41.202 - General construction of office buildings Since July 1, 2019 | |||||
Main activity: 41.203 - General construction of other non-residential buildings Since July 1, 2019 | |||||
Main activity: 42.21901 - Drilling and water well construction, shaft sinking Since October 15, 2015 | |||||
Main activity: 43.120 - Site preparation works Since October 15, 2015 | |||||
Main activity: 43.130 - Test drilling and surveys Since October 15, 2015 | |||||
Main activity: 43.21101 - Installation of electrical wiring and fittings Since July 1, 2019 | |||||
Main activity: 43.291 - Insulation works Since October 15, 2015 | |||||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since October 15, 2015 | |||||
Main activity: 43.29911 - Installation of lifts and escalators Since July 1, 2019 | |||||
Main activity: 43.310 - Plastering works Since October 1, 2024 | |||||
Main activity: 43.320 - Joinery works Since July 1, 2019 | |||||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since July 1, 2019 | |||||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since July 1, 2019 | |||||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since July 1, 2019 | |||||
Main activity: 43.341 - Painting of buildings Since October 1, 2024 | |||||
Main activity: 43.342 - Painting of civil engineering works Since October 1, 2024 | |||||
Main activity: 43.34201 - Painting of metal frames Since July 1, 2019 | |||||
Main activity: 43.390 - Other finishing work Since October 15, 2015 | |||||
Main activity: 43.910 - Roofing works Since July 1, 2019 | |||||
Main activity: 43.91001 - Framework assembly Since July 1, 2019 | |||||
Main activity: 43.91002 - Covering work using all materials Since July 1, 2019 | |||||
Main activity: 43.91003 - Installation of draining elements for rainwater Since July 1, 2019 | |||||
Main activity: 43.992 - Restoration of façades Since October 15, 2015 | |||||
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces Since October 15, 2015 | |||||
Main activity: 43.99402 - Execution of repointing Since October 15, 2015 | |||||
Main activity: 43.995 - Building restoration works Since October 1, 2024 | |||||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since October 15, 2015 | |||||
Main activity: 43.99902 - Formwork and rebar work Since September 16, 2020 | |||||
Main activity: 43.99903 - Construction of chimneys and industrial ovens Since July 1, 2019 | |||||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since October 15, 2015 | |||||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since October 15, 2015 | |||||
Main activity: 43.99907 - Construction of cold rooms, vaults, etc. Since July 1, 2020 |
|
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.