Establishment unit data
In general | |||||
Enterprise number: | 0718.942.917 | ||||
Status of the entity: | Active | ||||
Number of the establishment unit: | 2.284.119.673 | ||||
Status of the establishment unit: | Active | ||||
Start date: | January 23, 2019 | ||||
Name of the establishment unit: |
SC-STEELFRAMES Name in Dutch, since January 23, 2019 | ||||
Address of the establishment unit: |
Europark 2073
box 1
3530 Houthalen-Helchteren Since January 23, 2019 | ||||
Phone number: |
| ||||
Fax: | No information found in the CBE. | ||||
Email address: |
| ||||
Web address: | No information found in the CBE. | ||||
| |||||
Authorisations | |||||
No data included in CBE. | |||||
| |||||
Version of Nacebel codes for activities 2008(1) | |||||
Main activity: 41.201 - General construction of residential buildings Since January 23, 2019 | |||||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since January 23, 2019 | |||||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since January 23, 2019 | |||||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since January 23, 2019 | |||||
Main activity: 41.20112 - Realisation of "turnkey" apartments Since January 23, 2019 | |||||
Main activity: 41.203 - General construction of other non-residential buildings Since January 23, 2019 | |||||
Main activity: 41.20301 - Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc. Since January 23, 2019 | |||||
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use Since January 23, 2019 | |||||
Main activity: 42.21901 - Drilling and water well construction, shaft sinking Since January 23, 2019 | |||||
Main activity: 43.110 - Demolition works Since January 23, 2019 | |||||
Main activity: 43.11001 - Demolition of buildings and other constructions Since January 23, 2019 | |||||
Main activity: 43.120 - Site preparation works Since January 23, 2019 | |||||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since January 23, 2019 | |||||
Main activity: 43.12011 - Clearing of building sites Since January 23, 2019 | |||||
Main activity: 43.211 - Electrotechnical installation work for buildings Since January 23, 2019 | |||||
Main activity: 43.221 - Plumbing works Since January 23, 2019 | |||||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since January 23, 2019 | |||||
Main activity: 43.291 - Insulation works Since January 23, 2019 | |||||
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation Since January 23, 2019 | |||||
Main activity: 43.29102 - Insulation work for heating or cooling pipes Since January 23, 2019 | |||||
Main activity: 43.299 - Other installation works n.e.c. Since January 23, 2019 | |||||
Main activity: 43.310 - Plastering works Since January 23, 2019 | |||||
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since January 23, 2019 | |||||
Main activity: 43.320 - Joinery works Since January 23, 2019 | |||||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since January 23, 2019 | |||||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since January 23, 2019 | |||||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since January 23, 2019 | |||||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since January 23, 2019 | |||||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since January 23, 2019 | |||||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since January 23, 2019 | |||||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since January 23, 2019 | |||||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since January 23, 2019 | |||||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since January 23, 2019 | |||||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since January 23, 2019 | |||||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since January 23, 2019 | |||||
Main activity: 43.32031 - Assembly of gypsum drywalls Since January 23, 2019 | |||||
Main activity: 43.331 - Tiling of floors and walls Since January 23, 2019 | |||||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since January 23, 2019 | |||||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since January 23, 2019 | |||||
Main activity: 43.33301 - Wallpapering Since January 23, 2019 | |||||
Main activity: 43.341 - Painting of buildings Since January 23, 2019 | |||||
Main activity: 43.34201 - Painting of metal frames Since January 23, 2019 | |||||
Main activity: 43.343 - Glaziery Since January 23, 2019 | |||||
Main activity: 43.34301 - Fitting of glass, mirrors, etc. Since January 23, 2019 | |||||
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work Since January 23, 2019 | |||||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since January 23, 2019 | |||||
Main activity: 43.910 - Roofing works Since January 23, 2019 | |||||
Main activity: 43.991 - Waterproofing of walls Since January 23, 2019 | |||||
Main activity: 43.992 - Restoration of façades Since January 23, 2019 | |||||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since January 23, 2019 | |||||
Main activity: 43.99301 - Construction of decorative fireplaces and open fireplaces Since January 23, 2019 | |||||
Main activity: 43.994 - Masonry and repointing Since January 23, 2019 | |||||
Main activity: 43.99401 - Masonry Since January 23, 2019 | |||||
Main activity: 43.99402 - Execution of repointing Since January 23, 2019 | |||||
Main activity: 43.995 - Building restoration works Since January 23, 2019 | |||||
Main activity: 43.996 - Screed laying Since January 23, 2019 | |||||
Main activity: 43.99601 - Screed laying Since January 23, 2019 | |||||
Main activity: 43.999 - Other specialised construction activities Since January 23, 2019 | |||||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since January 23, 2019 | |||||
Main activity: 43.99902 - Formwork and rebar work Since January 23, 2019 | |||||
Main activity: 43.99903 - Construction of chimneys and industrial ovens Since January 23, 2019 | |||||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since January 23, 2019 | |||||
Main activity: 43.99905 - Execution of lifting work for third parties Since January 23, 2019 | |||||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since January 23, 2019 | |||||
Main activity: 46.14002 - Commission trade of construction machinery Since January 23, 2019 | |||||
Main activity: 46.630 - Wholesale trade of mining, construction and civil engineering machinery Since January 23, 2019 | |||||
Main activity: 70.22001 - Advice and assistance to companies and public services in planning, organisation, performance research, control, management information, etc. Since January 23, 2019 | |||||
Main activity: 71.11101 - Architectural consultancy activities to the principal Since January 23, 2019 | |||||
Main activity: 71.11103 - Supervision of construction work (structural work, installation, finishing work, etc.) Since January 23, 2019 | |||||
Main activity: 71.11301 - Studies and advice on urban planning and landscape architecture Since January 23, 2019 | |||||
Main activity: 71.12101 - Design and realisation of projects relating to electrical and electronic engineering; mining, chemical, mechanical and industrial engineering, systems engineering, security techniques, etc. Since January 23, 2019 | |||||
Main activity: 71.12102 - Industrial design Since January 23, 2019 | |||||
Main activity: 71.12104 - Elaboration of projects involving activities relating to civil or structural engineering, hydraulic engineering and traffic engineering Since January 23, 2019 | |||||
Main activity: 77.320 - Rental and leasing of construction and civil engineering machinery and equipment Since January 23, 2019 | |||||
| |||||
Version of the Nacebel codes for the NSSO-activities 2008(1) | |||||
Main activity: 41.201 - General construction of residential buildings Since October 14, 2019 |
|
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.