Establishment unit data
In general | |||||
Enterprise number: | 1007.821.783 | ||||
Status of the entity: | Active | ||||
Number of the establishment unit: | 2.357.559.264 | ||||
Status of the establishment unit: | Active | ||||
Start date: | April 1, 2024 | ||||
Name of the establishment unit: |
Maxime Lomba Name in French, since April 1, 2024 | ||||
Address of the establishment unit: |
Rue Haya 17
box *
4560 Clavier Since April 1, 2024 | ||||
Phone number: |
| ||||
Fax: | No information found in the CBE. | ||||
Email address: | No information found in the CBE. | ||||
Web address: | No information found in the CBE. | ||||
| |||||
Authorisations | |||||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||||
| |||||
Version of Nacebel codes for activities 2008(1) | |||||
Main activity: 25.110 - Manufacture of metal structures and parts of structures Since April 1, 2024 | |||||
Main activity: 25.610 - Treatment and coating of metals Since April 1, 2024 | |||||
Main activity: 25.620 - Machining Since April 1, 2024 | |||||
Main activity: 25.910 - Manufacture of steel drums and similar containers Since April 1, 2024 | |||||
Main activity: 25.920 - Manufacture of light metal packaging Since April 1, 2024 | |||||
Main activity: 25.930 - Manufacture of wire products, chain and springs Since April 1, 2024 | |||||
Main activity: 25.999 - Manufacture of other metal products n.e.c. Since April 1, 2024 | |||||
Main activity: 31.010 - Manufacture of office and shop furniture Since April 1, 2024 | |||||
Main activity: 31.020 - Manufacture of kitchen furniture Since April 1, 2024 | |||||
Main activity: 31.091 - Manufacture of dining rooms, lounges, bedrooms and bathrooms Since April 1, 2024 | |||||
Main activity: 31.09121 - Manufacture of bathroom furniture Since April 1, 2024 | |||||
Main activity: 31.092 - Manufacture of garden and outdoor furniture Since April 1, 2024 | |||||
Main activity: 31.099 - Manufacture of other furniture n.e.c. Since April 1, 2024 | |||||
Main activity: 33.140 - Repair of electrical equipment Since April 1, 2024 | |||||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since April 1, 2024 | |||||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since April 1, 2024 | |||||
Main activity: 41.20122 - General coordination on the construction site Since April 1, 2024 | |||||
Main activity: 41.20301 - Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc. Since April 1, 2024 | |||||
Main activity: 43.211 - Electrotechnical installation work for buildings Since April 1, 2024 | |||||
Main activity: 43.21101 - Installation of electrical wiring and fittings Since April 1, 2024 | |||||
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities Since April 1, 2024 | |||||
Main activity: 43.21103 - Installation of surveillance and alarm systems against intruders Since April 1, 2024 | |||||
Main activity: 43.212 - Electrotechnical installation work other than buildings Since April 1, 2024 | |||||
Main activity: 43.21201 - Installation of illumination and signalling systems for roads, railways, airports and port facilities (including the installation of traffic signs) Since April 1, 2024 | |||||
Main activity: 43.22211 - Installation of electrical heating systems Since April 1, 2024 | |||||
Main activity: 43.390 - Other finishing work Since April 1, 2024 | |||||
Main activity: 43.992 - Restoration of façades Since April 1, 2024 | |||||
Main activity: 43.994 - Masonry and repointing Since April 1, 2024 | |||||
Main activity: 43.99401 - Masonry Since April 1, 2024 | |||||
Main activity: 43.99907 - Construction of cold rooms, vaults, etc. Since April 1, 2024 | |||||
Main activity: 71.121 - Engineering and technical consultancy activities, except surveying activities Since April 1, 2024 | |||||
Main activity: 71.12103 - Development of projects involving acoustic engineering, air conditioning, refrigeration, sanitation and pollution control, etc. Since April 1, 2024 |
| ||
No data included in CBE. |
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.