shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0438.518.093
Status of the entity:Active
Number of the establishment unit:2.045.266.774
Status of the establishment unit:Active
Start date:October 17, 1989
Name of the establishment unit: GORIS L
Name in Dutch, since October 17, 1989
Address of the establishment unit:
Neerzijde   10
2460   Kasterlee
Since May 8, 2019
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC)  Click here
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 41.201 - General construction of residential buildings
Since May 8, 2019
Main activity: 41.203 - General construction of other non-residential buildings
Since May 8, 2019
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use
Since May 8, 2019
Main activity: 43.110 - Demolition works
Since May 8, 2019
Main activity: 43.120 - Site preparation works
Since May 8, 2019
Main activity: 43.211 - Electrotechnical installation work for buildings
Since May 8, 2019
Main activity: 43.221 - Plumbing works
Since May 8, 2019
Main activity: 43.222 - Installation of heating, ventilation and air conditioning
Since May 8, 2019
Main activity: 43.291 - Insulation works
Since May 8, 2019
Main activity: 43.299 - Other installation works n.e.c.
Since May 8, 2019
Main activity: 43.320 - Joinery works
Since May 8, 2019
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc.
Since May 8, 2019
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc.
Since May 8, 2019
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc.
Since May 8, 2019
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors
Since May 8, 2019
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc.
Since May 8, 2019
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc.
Since May 8, 2019
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc.
Since May 8, 2019
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors
Since May 8, 2019
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery
Since May 8, 2019
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc.
Since May 8, 2019
Main activity: 43.32031 - Assembly of gypsum drywalls
Since May 8, 2019
Main activity: 43.331 - Tiling of floors and walls
Since May 8, 2019
Main activity: 43.332 - Fitting of wood coverings for floors and walls
Since May 8, 2019
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials
Since May 8, 2019
Main activity: 43.341 - Painting of buildings
Since May 8, 2019
Main activity: 43.343 - Glaziery
Since May 8, 2019
Main activity: 43.390 - Other finishing work
Since May 8, 2019
Main activity: 43.910 - Roofing works
Since May 8, 2019
Main activity: 43.91001 - Framework assembly
Since May 8, 2019
Main activity: 43.991 - Waterproofing of walls
Since May 8, 2019
Main activity: 43.992 - Restoration of façades
Since May 8, 2019
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces
Since May 8, 2019
Main activity: 43.994 - Masonry and repointing
Since May 8, 2019
Main activity: 43.995 - Building restoration works
Since May 8, 2019
Main activity: 43.996 - Screed laying
Since May 8, 2019
Main activity: 43.99601 - Screed laying
Since January 1, 2008
Main activity: 43.999 - Other specialised construction activities
Since May 8, 2019
Main activity: 43.99901 - Establishment of foundations, including pile driving
Since May 8, 2019
Main activity: 43.99902 - Formwork and rebar work
Since May 8, 2019
Main activity: 43.99903 - Construction of chimneys and industrial ovens
Since May 8, 2019
Main activity: 49.410 - Freight transport by road except removal services
Since May 8, 2019
Main activity: 71.11103 - Supervision of construction work (structural work, installation, finishing work, etc.)
Since May 8, 2019
 
Show the activities for NACEBEL codification version 2003.
 
 
No data included in CBE.

(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.