Establishment unit data
In general | |||
Enterprise number: | 0680.539.429 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.273.209.450 | ||
Status of the establishment unit: | Active | ||
Start date: | October 1, 2017 | ||
Name of the establishment unit: |
CASAWOOD CONSTRUCTION Name in French, since October 1, 2017 | ||
Address of the establishment unit: |
Chemin de Casteau 186
7061 Soignies Since December 31, 2019 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since October 1, 2017 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since October 1, 2017 | |||
Main activity: 41.20121 - Realisation of the structural work of buildings Since October 1, 2017 | |||
Main activity: 41.20122 - General coordination on the construction site Since October 1, 2017 | |||
Main activity: 41.202 - General construction of office buildings Since October 1, 2017 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since October 1, 2017 | |||
Main activity: 41.20301 - Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc. Since October 1, 2017 | |||
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use Since October 1, 2017 | |||
Main activity: 42.990 - Construction of other civil engineering projects n.e.c. Since October 1, 2017 | |||
Main activity: 42.99001 - Construction of playgrounds and sports fields, swimming pools, etc. Since October 1, 2017 | |||
Main activity: 43.110 - Demolition works Since October 1, 2017 | |||
Main activity: 43.11001 - Demolition of buildings and other constructions Since October 1, 2017 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since October 1, 2017 | |||
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites Since October 1, 2017 | |||
Main activity: 43.291 - Insulation works Since October 1, 2017 | |||
Main activity: 43.29901 - Installation of blinds and awnings Since October 1, 2017 | |||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since October 1, 2017 | |||
Main activity: 43.29904 - General installation work Since October 1, 2017 | |||
Main activity: 43.320 - Joinery works Since October 1, 2017 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since October 1, 2017 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since October 1, 2017 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since October 1, 2017 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since October 1, 2017 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since October 1, 2017 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since October 1, 2017 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since October 1, 2017 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since October 1, 2017 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since October 1, 2017 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since October 1, 2017 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since October 1, 2017 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since October 1, 2017 | |||
Main activity: 43.33201 - Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings Since October 1, 2017 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since October 1, 2017 | |||
Main activity: 43.343 - Glaziery Since October 1, 2017 | |||
Main activity: 43.34301 - Fitting of glass, mirrors, etc. Since October 1, 2017 | |||
Main activity: 43.390 - Other finishing work Since October 1, 2017 | |||
Main activity: 43.39002 - Other building completion and finishing work n.e.s. Since October 1, 2017 | |||
Main activity: 43.910 - Roofing works Since October 1, 2017 | |||
Main activity: 43.91001 - Framework assembly Since October 1, 2017 | |||
Main activity: 43.91002 - Covering work using all materials Since October 1, 2017 | |||
Main activity: 43.91003 - Installation of draining elements for rainwater Since October 1, 2017 | |||
Main activity: 43.991 - Waterproofing of walls Since October 1, 2017 | |||
Main activity: 43.99101 - Waterproofing of roofs and roof terraces Since October 1, 2017 | |||
Main activity: 43.99111 - Treatment of walls with water repellent products Since October 1, 2017 | |||
Main activity: 43.992 - Restoration of façades Since October 1, 2017 | |||
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces Since October 1, 2017 | |||
Main activity: 43.99301 - Construction of decorative fireplaces and open fireplaces Since October 1, 2017 | |||
Main activity: 43.994 - Masonry and repointing Since October 1, 2017 | |||
Main activity: 43.99401 - Masonry Since October 1, 2017 | |||
Main activity: 43.99402 - Execution of repointing Since October 1, 2017 | |||
Main activity: 43.995 - Building restoration works Since October 1, 2017 | |||
Main activity: 43.999 - Other specialised construction activities Since October 1, 2017 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since October 1, 2017 | |||
Main activity: 43.99902 - Formwork and rebar work Since October 1, 2017 | |||
Main activity: 43.99903 - Construction of chimneys and industrial ovens Since October 1, 2017 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since October 1, 2017 | |||
Main activity: 43.99905 - Execution of lifting work for third parties Since October 1, 2017 | |||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since October 1, 2017 | |||
Main activity: 43.99907 - Construction of cold rooms, vaults, etc. Since October 1, 2017 | |||
Main activity: 43.99911 - Rental of construction equipment with operator Since October 1, 2017 | |||
Main activity: 43.99931 - Installation of private swimming pools Since October 1, 2017 | |||
| |||
Version of the Nacebel codes for the NSSO-activities 2008(1) | |||
Main activity: 41.201 - General construction of residential buildings Since August 2, 2021 |
|
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.