Establishment unit data
In general | |||||
Enterprise number: | 0888.422.406 | ||||
Status of the entity: | Active | ||||
Number of the establishment unit: | 2.160.945.511 | ||||
Status of the establishment unit: | Active | ||||
Start date: | April 1, 2007 | ||||
Name of the establishment unit: |
Bart Cardoen Name in Dutch, since April 1, 2007 | ||||
Address of the establishment unit: |
Solleveld 1
9550 Herzele Since April 1, 2007 | ||||
Phone number: |
| ||||
Fax: | No information found in the CBE. | ||||
Email address: | No information found in the CBE. | ||||
Web address: | No information found in the CBE. | ||||
| |||||
Authorisations | |||||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||||
| |||||
Version of Nacebel codes for activities 2008(2) | |||||
Main activity: 16.100 - Sawmilling and planing of wood Since January 1, 2008 | |||||
Main activity: 16.230 - Manufacture of other builders' carpentry and joinery Since January 1, 2008 | |||||
Main activity: 16.291 - Manufacture of other products of wood Since January 1, 2008 | |||||
Main activity: 25.62001 - Drilling, turning, milling, shaving, planing, lapping, broaching, dressage, sawing, grinding, sharpening, etc. of metal parts Since January 1, 2008 | |||||
Main activity: 28.299 - Manufacture of other general-purpose machinery n.e.c. Since January 1, 2008 | |||||
Main activity: 33.12011 - Mechanical maintenance and repairs for third parties Since January 1, 2008 | |||||
Main activity: 41.201 - General construction of residential buildings Since January 1, 2008 | |||||
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers) Since January 1, 2008 | |||||
Main activity: 42.91905 - Construction of settling ponds and other structures for waste water treatment Since January 1, 2008 | |||||
Main activity: 42.99001 - Construction of playgrounds and sports fields, swimming pools, etc. Since January 1, 2008 | |||||
Main activity: 43.110 - Demolition works Since January 1, 2008 | |||||
Main activity: 43.120 - Site preparation works Since January 1, 2008 | |||||
Main activity: 43.13001 - Test surveys, test drilling and core sampling for construction as well as for geophysical or geological studies, or similar Since January 1, 2008 | |||||
Main activity: 43.21101 - Installation of electrical wiring and fittings Since January 1, 2008 | |||||
Main activity: 43.221 - Plumbing works Since January 1, 2008 | |||||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since January 1, 2008 | |||||
Main activity: 43.22211 - Installation of electrical heating systems Since January 1, 2008 | |||||
Main activity: 43.291 - Insulation works Since January 1, 2008 | |||||
Main activity: 43.29911 - Installation of lifts and escalators Since January 1, 2008 | |||||
Main activity: 43.310 - Plastering works Since January 1, 2008 | |||||
Main activity: 43.320 - Joinery works Since January 1, 2008 | |||||
Main activity: 43.331 - Tiling of floors and walls Since January 1, 2008 | |||||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since January 1, 2008 | |||||
Main activity: 43.34201 - Painting of metal frames Since January 1, 2008 | |||||
Main activity: 43.343 - Glaziery Since January 1, 2008 | |||||
Main activity: 43.390 - Other finishing work Since January 1, 2008 | |||||
Main activity: 43.910 - Roofing works Since January 1, 2008 | |||||
Main activity: 43.99301 - Construction of decorative fireplaces and open fireplaces Since January 1, 2008 | |||||
Main activity: 43.99401 - Masonry Since January 1, 2008 | |||||
Main activity: 43.99402 - Execution of repointing Since January 1, 2008 | |||||
Main activity: 43.99601 - Screed laying Since January 1, 2008 | |||||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since January 1, 2008 | |||||
Main activity: 43.99902 - Formwork and rebar work Since January 1, 2008 | |||||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since January 1, 2008 | |||||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since January 1, 2008 | |||||
Main activity: 45.111 - Wholesale trade of cars and other light motor vehicles (= 3.5 tons) Since January 1, 2008 | |||||
Main activity: 45.112 - Commission trade of cars and other light motor vehicles (= 3.5 tons) Since January 1, 2008 | |||||
Main activity: 45.113 - Retail trade of cars and other light motor vehicles (= 3.5 tons) Since January 1, 2008 | |||||
Main activity: 45.194 - Trade of trailers, semi-trailers and caravans Since January 1, 2008 | |||||
Main activity: 45.201 - General maintenance and repair of cars and other light motor vehicles (= 3.5 ton) Since January 1, 2008 | |||||
Main activity: 45.320 - Retail trade of motor vehicle parts and accessories Since January 1, 2008 | |||||
Main activity: 45.402 - Maintenance, repair and retail trade of motorcycles, including spares and accessories Since January 1, 2008 | |||||
Main activity: 46.130 - Commission trade of timber and building materials Since January 1, 2008 | |||||
Main activity: 71.121 - Engineering and technical consultancy activities, except surveying activities Since January 1, 2008 | |||||
Main activity: 82.990 - Other business support service activities n.e.c. Since January 1, 2008 | |||||
Show the activities for NACEBEL codification version 2003. |
| ||
No data included in CBE. |
(1)Address data and contact data have been divided from each other. Due to this change it is possible that the start date of the contact data is not correct. For more information, click here.
(2)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.