Establishment unit data
In general | |||
Enterprise number: | 1011.308.142 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.361.609.807 | ||
Status of the establishment unit: | Active | ||
Start date: | July 8, 2024 | ||
Name of the establishment unit: |
RENOBERTO Name in French, since July 8, 2024 | ||
Address of the establishment unit: |
Alsembergsesteenweg 812
1653 Beersel Since July 8, 2024 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
No data included in CBE. | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 23.120 - Shaping and processing of flat glass Since July 8, 2024 | |||
Main activity: 33.11001 - Repair and maintenance of domestic boilers Since July 8, 2024 | |||
Main activity: 33.12011 - Mechanical maintenance and repairs for third parties Since July 8, 2024 | |||
Main activity: 33.140 - Repair of electrical equipment Since July 8, 2024 | |||
Main activity: 33.200 - Installation of industrial machinery and equipment Since July 8, 2024 | |||
Main activity: 41.201 - General construction of residential buildings Since July 8, 2024 | |||
Main activity: 41.20122 - General coordination on the construction site Since July 8, 2024 | |||
Main activity: 41.202 - General construction of office buildings Since July 8, 2024 | |||
Main activity: 41.203 - General construction of other non-residential buildings Since July 8, 2024 | |||
Main activity: 41.20301 - Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc. Since July 8, 2024 | |||
Main activity: 42.21901 - Drilling and water well construction, shaft sinking Since July 8, 2024 | |||
Main activity: 42.21911 - Construction of water supply, distribution and drainage networks Since July 8, 2024 | |||
Main activity: 42.220 - Construction of electricity and telecommunications networks Since July 8, 2024 | |||
Main activity: 43.110 - Demolition works Since July 8, 2024 | |||
Main activity: 43.11001 - Demolition of buildings and other constructions Since July 8, 2024 | |||
Main activity: 43.120 - Site preparation works Since July 8, 2024 | |||
Main activity: 43.130 - Test drilling and surveys Since July 8, 2024 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since July 8, 2024 | |||
Main activity: 43.21101 - Installation of electrical wiring and fittings Since July 8, 2024 | |||
Main activity: 43.21103 - Installation of surveillance and alarm systems against intruders Since July 8, 2024 | |||
Main activity: 43.212 - Electrotechnical installation work other than buildings Since July 8, 2024 | |||
Main activity: 43.21201 - Installation of illumination and signalling systems for roads, railways, airports and port facilities (including the installation of traffic signs) Since July 8, 2024 | |||
Main activity: 43.221 - Plumbing works Since July 8, 2024 | |||
Main activity: 43.22101 - Installation in buildings or other structures of: plumbing and sanitary facilities, pipes, gas and water connections (except for heating), installation of automatic fire extinguishing systems, etc. Since July 8, 2024 | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since July 8, 2024 | |||
Main activity: 43.22211 - Installation of electrical heating systems Since July 8, 2024 | |||
Main activity: 43.291 - Insulation works Since July 8, 2024 | |||
Main activity: 43.299 - Other installation works n.e.c. Since July 8, 2024 | |||
Main activity: 43.29902 - Installation of signs, illuminated or not Since July 8, 2024 | |||
Main activity: 43.29903 - Other installation works n.e.s., including installation of accessories Since July 8, 2024 | |||
Main activity: 43.29911 - Installation of lifts and escalators Since July 8, 2024 | |||
Main activity: 43.310 - Plastering works Since July 8, 2024 | |||
Main activity: 43.31001 - Application in buildings or other construction projects of plaster or stucco for interiors or exteriors, including related lathing materials Since July 8, 2024 | |||
Main activity: 43.320 - Joinery works Since July 8, 2024 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since July 8, 2024 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since July 8, 2024 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since July 8, 2024 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since July 8, 2024 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since July 8, 2024 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since July 8, 2024 | |||
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc. Since July 8, 2024 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since July 8, 2024 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since July 8, 2024 | |||
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc. Since July 8, 2024 | |||
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery Since July 8, 2024 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since July 8, 2024 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since July 8, 2024 | |||
Main activity: 43.331 - Tiling of floors and walls Since July 8, 2024 | |||
Main activity: 43.33101 - Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc. Since July 8, 2024 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since July 8, 2024 | |||
Main activity: 43.33201 - Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings Since July 8, 2024 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since July 8, 2024 | |||
Main activity: 43.33301 - Wallpapering Since July 8, 2024 | |||
Main activity: 43.341 - Painting of buildings Since July 8, 2024 | |||
Main activity: 43.34101 - Interior and exterior painting of buildings Since July 8, 2024 | |||
Main activity: 43.342 - Painting of civil engineering works Since July 8, 2024 | |||
Main activity: 43.34201 - Painting of metal frames Since July 8, 2024 | |||
Main activity: 43.343 - Glaziery Since July 8, 2024 | |||
Main activity: 43.34301 - Fitting of glass, mirrors, etc. Since July 8, 2024 | |||
Main activity: 43.390 - Other finishing work Since July 8, 2024 | |||
Main activity: 43.910 - Roofing works Since July 8, 2024 | |||
Main activity: 43.91001 - Framework assembly Since July 8, 2024 | |||
Main activity: 43.91002 - Covering work using all materials Since July 8, 2024 | |||
Main activity: 43.91003 - Installation of draining elements for rainwater Since July 8, 2024 | |||
Main activity: 43.991 - Waterproofing of walls Since July 8, 2024 | |||
Main activity: 43.99101 - Waterproofing of roofs and roof terraces Since July 8, 2024 | |||
Main activity: 43.99111 - Treatment of walls with water repellent products Since July 8, 2024 | |||
Main activity: 43.992 - Restoration of façades Since July 8, 2024 | |||
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces Since July 8, 2024 | |||
Main activity: 43.99401 - Masonry Since July 8, 2024 | |||
Main activity: 43.99402 - Execution of repointing Since July 8, 2024 | |||
Main activity: 43.996 - Screed laying Since July 8, 2024 | |||
Main activity: 43.999 - Other specialised construction activities Since July 8, 2024 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since July 8, 2024 | |||
Main activity: 43.99902 - Formwork and rebar work Since July 8, 2024 | |||
Main activity: 43.99903 - Construction of chimneys and industrial ovens Since July 8, 2024 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since July 8, 2024 | |||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since July 8, 2024 | |||
Main activity: 71.11103 - Supervision of construction work (structural work, installation, finishing work, etc.) Since July 8, 2024 | |||
Main activity: 95.210 - Repair of consumer electronics Since July 8, 2024 | |||
Main activity: 95.220 - Repair of household appliances and home and garden equipment Since July 8, 2024 |
|
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.