shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0684.472.481
Status of the entity:Active
Number of the establishment unit:2.269.474.257
Status of the establishment unit:Active
Start date:January 1, 2018
Name of the establishment unit: D.B. BAT
Name in French, since January 1, 2018
Address of the establishment unit:
Rue Duchâteau Frères   18
7170   Manage
Since January 1, 2019(1)
Phone number:
0479/210309 Since January 1, 2018(2)
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(3)

Main activity: 41.20101 - Realisation of the main structure of individual houses
Since January 1, 2018
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.)
Since January 1, 2018
Main activity: 41.20122 - General coordination on the construction site
Since January 1, 2018
Main activity: 41.20301 - Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc.
Since January 1, 2018
Main activity: 42.21911 - Construction of water supply, distribution and drainage networks
Since January 1, 2018
Main activity: 42.22001 - Construction of electrical energy transmission and distribution lines
Since January 1, 2018
Main activity: 43.110 - Demolition works
Since January 1, 2018
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc.
Since January 1, 2018
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites
Since January 1, 2018
Main activity: 43.12011 - Clearing of building sites
Since January 1, 2018
Main activity: 43.211 - Electrotechnical installation work for buildings
Since January 1, 2018
Main activity: 43.212 - Electrotechnical installation work other than buildings
Since January 1, 2018
Main activity: 43.221 - Plumbing works
Since January 1, 2018
Main activity: 43.222 - Installation of heating, ventilation and air conditioning
Since January 1, 2018
Main activity: 43.291 - Insulation works
Since January 1, 2018
Main activity: 43.299 - Other installation works n.e.c.
Since January 1, 2018
Main activity: 43.310 - Plastering works
Since January 1, 2018
Main activity: 43.320 - Joinery works
Since January 1, 2018
Main activity: 43.32031 - Assembly of gypsum drywalls
Since January 1, 2018
Main activity: 43.331 - Tiling of floors and walls
Since January 1, 2018
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials
Since January 1, 2018
Main activity: 43.33301 - Wallpapering
Since January 1, 2018
Main activity: 43.34101 - Interior and exterior painting of buildings
Since January 1, 2018
Main activity: 43.34201 - Painting of metal frames
Since January 1, 2018
Main activity: 43.343 - Glaziery
Since January 1, 2018
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work
Since January 1, 2018
Main activity: 43.910 - Roofing works
Since January 1, 2018
Main activity: 43.91001 - Framework assembly
Since January 1, 2018
Main activity: 43.91003 - Installation of draining elements for rainwater
Since January 1, 2018
Main activity: 43.991 - Waterproofing of walls
Since January 1, 2018
Main activity: 43.99101 - Waterproofing of roofs and roof terraces
Since January 1, 2018
Main activity: 43.99111 - Treatment of walls with water repellent products
Since January 1, 2018
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors
Since January 1, 2018
Main activity: 43.99301 - Construction of decorative fireplaces and open fireplaces
Since January 1, 2018
Main activity: 43.994 - Masonry and repointing
Since January 1, 2018
Main activity: 43.995 - Building restoration works
Since January 1, 2018
Main activity: 43.996 - Screed laying
Since January 1, 2018
Main activity: 43.99902 - Formwork and rebar work
Since January 1, 2018
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work
Since January 1, 2018
Main activity: 71.11103 - Supervision of construction work (structural work, installation, finishing work, etc.)
Since January 1, 2018
Main activity: 71.121 - Engineering and technical consultancy activities, except surveying activities
Since January 1, 2018
Main activity: 74.104 - Interior decoration
Since January 1, 2018
Main activity: 81.300 - Landscape service activities
Since January 1, 2018
 
 

(1) The modification made to the address is of a technical nature. It is related to the modification of a code used in the address data.

(2)Address data and contact data have been divided from each other. Due to this change it is possible that the start date of the contact data is not correct. For more information, click here.

(3)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.