Establishment unit data
In general | |||
Enterprise number: | 0689.747.501 | ||
Status of the entity: | Active | ||
Number of the establishment unit: | 2.272.595.479 | ||
Status of the establishment unit: | Active | ||
Start date: | February 2, 2018 | ||
Name of the establishment unit: | No information found in the CBE. | ||
Address of the establishment unit: |
Kapelleommegang 34
9310 Aalst Since February 2, 2018 | ||
Phone number: | No information found in the CBE. | ||
Fax: | No information found in the CBE. | ||
Email address: | No information found in the CBE. | ||
Web address: | No information found in the CBE. | ||
| |||
Authorisations | |||
Licences registered with the Federal Agency for the Safety of the Food Chain (FASFC) Click here | |||
| |||
Version of Nacebel codes for activities 2008(1) | |||
Main activity: 25.110 - Manufacture of metal structures and parts of structures Since February 2, 2018 | |||
Main activity: 25.62001 - Drilling, turning, milling, shaving, planing, lapping, broaching, dressage, sawing, grinding, sharpening, etc. of metal parts Since February 2, 2018 | |||
Main activity: 31.010 - Manufacture of office and shop furniture Since February 2, 2018 | |||
Main activity: 31.091 - Manufacture of dining rooms, lounges, bedrooms and bathrooms Since February 2, 2018 | |||
Main activity: 31.092 - Manufacture of garden and outdoor furniture Since February 2, 2018 | |||
Main activity: 31.099 - Manufacture of other furniture n.e.c. Since February 2, 2018 | |||
Main activity: 41.20101 - Realisation of the main structure of individual houses Since February 2, 2018 | |||
Main activity: 41.20102 - Construction of individual "turnkey" houses Since February 2, 2018 | |||
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.) Since February 2, 2018 | |||
Main activity: 41.20122 - General coordination on the construction site Since February 2, 2018 | |||
Main activity: 42.11001 - Construction of motorways, roads, streets, pavements and other vehicular and pedestrian roads (including the installation of crash barriers) Since February 2, 2018 | |||
Main activity: 42.212 - Construction of drainage systems for waste water Since February 2, 2018 | |||
Main activity: 43.110 - Demolition works Since February 2, 2018 | |||
Main activity: 43.120 - Site preparation works Since February 2, 2018 | |||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since February 2, 2018 | |||
Main activity: 43.211 - Electrotechnical installation work for buildings Since February 2, 2018 | |||
Main activity: 43.21103 - Installation of surveillance and alarm systems against intruders Since February 2, 2018 | |||
Main activity: 43.221 - Plumbing works Since February 2, 2018 | |||
Main activity: 43.222 - Installation of heating, ventilation and air conditioning Since February 2, 2018 | |||
Main activity: 43.291 - Insulation works Since February 2, 2018 | |||
Main activity: 43.310 - Plastering works Since February 2, 2018 | |||
Main activity: 43.320 - Joinery works Since February 2, 2018 | |||
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc. Since February 2, 2018 | |||
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc. Since February 2, 2018 | |||
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc. Since February 2, 2018 | |||
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors Since February 2, 2018 | |||
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc. Since February 2, 2018 | |||
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc. Since February 2, 2018 | |||
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc. Since February 2, 2018 | |||
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors Since February 2, 2018 | |||
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc. Since February 2, 2018 | |||
Main activity: 43.32031 - Assembly of gypsum drywalls Since February 2, 2018 | |||
Main activity: 43.331 - Tiling of floors and walls Since February 2, 2018 | |||
Main activity: 43.33101 - Fitting in buildings or other construction projects of: wall coverings or ceramic, concrete or stone tiles; granite flooring and wall coverings, etc. Since February 2, 2018 | |||
Main activity: 43.332 - Fitting of wood coverings for floors and walls Since February 2, 2018 | |||
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials Since February 2, 2018 | |||
Main activity: 43.34101 - Interior and exterior painting of buildings Since February 2, 2018 | |||
Main activity: 43.34201 - Painting of metal frames Since February 2, 2018 | |||
Main activity: 43.343 - Glaziery Since February 2, 2018 | |||
Main activity: 43.390 - Other finishing work Since February 2, 2018 | |||
Main activity: 43.91001 - Framework assembly Since February 2, 2018 | |||
Main activity: 43.91002 - Covering work using all materials Since February 2, 2018 | |||
Main activity: 43.991 - Waterproofing of walls Since February 2, 2018 | |||
Main activity: 43.992 - Restoration of façades Since February 2, 2018 | |||
Main activity: 43.994 - Masonry and repointing Since February 2, 2018 | |||
Main activity: 43.995 - Building restoration works Since February 2, 2018 | |||
Main activity: 43.99901 - Establishment of foundations, including pile driving Since February 2, 2018 | |||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since February 2, 2018 | |||
Main activity: 46.130 - Commission trade of timber and building materials Since February 2, 2018 | |||
Main activity: 46.620 - Wholesale trade of machine tools Since February 2, 2018 | |||
Main activity: 46.731 - Wholesale trade of construction materials, general assortment Since February 2, 2018 | |||
Main activity: 46.732 - Wholesale trade of wood Since February 2, 2018 | |||
Main activity: 46.734 - Wholesale trade of flat glass Since February 2, 2018 | |||
Main activity: 47.521 - Retail trade of specialised stores of building materials, general assortment in specialised stores Since February 2, 2018 | |||
Main activity: 47.524 - Retail trade of parquet, laminate and cork covering in specialised stores Since February 2, 2018 | |||
Main activity: 68.100 - Buying and selling of own real estate Since February 2, 2018 | |||
Main activity: 71.112 - Interior architecture Since February 2, 2018 | |||
Main activity: 71.113 - Architectural, urban planning and landscape architectural activities Since February 2, 2018 | |||
Main activity: 71.11302 - Design of gardens, parks, etc. Since February 2, 2018 | |||
Main activity: 71.121 - Engineering and technical consultancy activities, except surveying activities Since February 2, 2018 | |||
Main activity: 74.101 - Creating templates for personal and household goods Since February 2, 2018 | |||
Main activity: 74.103 - Graphic design activities Since February 2, 2018 | |||
Main activity: 74.104 - Interior decoration Since February 2, 2018 | |||
Main activity: 74.105 - Shop window decoration Since February 2, 2018 | |||
Main activity: 81.30002 - Creation and maintenance of gardens, parks and green spaces for sports facilities Since February 2, 2018 | |||
Main activity: 95.240 - Repair of furniture and home furnishings Since February 2, 2018 |
| ||
No data included in CBE. |
(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.