shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0758.434.288
Status of the entity:Active
Number of the establishment unit:2.309.542.086
Status of the establishment unit:Active
Start date:November 16, 2020
Name of the establishment unit: Faster
Name in Dutch, since November 16, 2020
Address of the establishment unit:
Antwerpse Steenweg   155
9140   Temse
Since November 16, 2020
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 41.201 - General construction of residential buildings
Since November 16, 2020
Additional activity: 41.20102 - Construction of individual "turnkey" houses
Since November 16, 2020
Additional activity: 41.20122 - General coordination on the construction site
Since November 16, 2020
Additional activity: 42.211 - Construction of water and gas distribution networks
Since November 16, 2020
Additional activity: 42.21911 - Construction of water supply, distribution and drainage networks
Since November 16, 2020
Additional activity: 42.21912 - Construction of networks to transport gas, petroleum products, etc.
Since November 16, 2020
Additional activity: 42.22001 - Construction of electrical energy transmission and distribution lines
Since November 16, 2020
Additional activity: 43.120 - Site preparation works
Since November 16, 2020
Additional activity: 43.130 - Test drilling and surveys
Since November 16, 2020
Additional activity: 43.211 - Electrotechnical installation work for buildings
Since November 16, 2020
Additional activity: 43.21101 - Installation of electrical wiring and fittings
Since November 16, 2020
Additional activity: 43.310 - Plastering works
Since November 16, 2020
Additional activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc.
Since November 16, 2020
Additional activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc.
Since November 16, 2020
Additional activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc.
Since November 16, 2020
Additional activity: 43.32015 - Assembly of metal greenhouses, verandas, etc.
Since November 16, 2020
Additional activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work
Since November 16, 2020
Additional activity: 43.910 - Roofing works
Since November 16, 2020
Additional activity: 43.91001 - Framework assembly
Since November 16, 2020
Additional activity: 43.91002 - Covering work using all materials
Since November 16, 2020
Additional activity: 43.91003 - Installation of draining elements for rainwater
Since November 16, 2020
Additional activity: 43.99101 - Waterproofing of roofs and roof terraces
Since November 16, 2020
Additional activity: 43.992 - Restoration of façades
Since November 16, 2020
Additional activity: 43.994 - Masonry and repointing
Since November 16, 2020
Additional activity: 43.99401 - Masonry
Since November 16, 2020
Additional activity: 43.99402 - Execution of repointing
Since November 16, 2020
Additional activity: 43.999 - Other specialised construction activities
Since November 16, 2020
Additional activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms
Since November 16, 2020
Additional activity: 46.13001 - Commission trade of timber and building materials
Since November 16, 2020
 
 

(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.