shadow
The English version of the Public Search application constitutes an unofficial English translation and is provided for information purposes only.
No legal rights can therefore be derived from this translation. For the official application, please consult the Dutch, French or German versions of the Public Search application.


Establishment unit data

In general

Enterprise number:0802.548.306
Status of the entity:Active
Number of the establishment unit:2.347.547.676
Status of the establishment unit:Active
Start date:July 1, 2023
Name of the establishment unit: MAYFAIR SOLUTIONS
Name in French, since July 1, 2023
Address of the establishment unit:
Place Lt. Graff   15
1780   Wemmel
Since July 1, 2023
Phone number:No information found in the CBE.
Fax:No information found in the CBE.
Email address:No information found in the CBE.
Web address:No information found in the CBE.
 
 

Authorisations

No data included in CBE.
 
 

Version of Nacebel codes for activities 2008(1)

Main activity: 41.201 - General construction of residential buildings
Since July 1, 2023
Main activity: 41.20101 - Realisation of the main structure of individual houses
Since July 1, 2023
Main activity: 41.20102 - Construction of individual "turnkey" houses
Since July 1, 2023
Main activity: 41.20111 - Realisation of the main structure of multi-cellular buildings (apartments, etc.)
Since July 1, 2023
Main activity: 41.20112 - Realisation of "turnkey" apartments
Since July 1, 2023
Main activity: 41.20121 - Realisation of the structural work of buildings
Since July 1, 2023
Main activity: 41.20122 - General coordination on the construction site
Since July 1, 2023
Main activity: 41.202 - General construction of office buildings
Since July 1, 2023
Main activity: 41.203 - General construction of other non-residential buildings
Since July 1, 2023
Main activity: 41.20301 - Realisation of structural work on buildings and industrial or commercial structures, vehicle depots, warehouses, schools, clinics, buildings for the practice of worship, etc.
Since July 1, 2023
Main activity: 41.20302 - Assembly of hangars, barns, silos, etc., for agricultural use
Since July 1, 2023
Main activity: 42.110 - Construction of roads and motorways
Since July 1, 2023
Main activity: 42.11003 - Paint marking of pavements and lay-bys or car parks
Since July 1, 2023
Main activity: 42.130 - Construction of bridges and tunnels
Since July 1, 2023
Main activity: 42.211 - Construction of water and gas distribution networks
Since July 1, 2023
Main activity: 42.212 - Construction of drainage systems for waste water
Since July 1, 2023
Main activity: 42.219 - Construction of networks for fluids n.e.c.
Since July 1, 2023
Main activity: 42.22002 - Construction of telecommunication lines and networks
Since July 1, 2023
Main activity: 42.919 - Construction of water projects, except dredging works
Since July 1, 2023
Main activity: 42.99001 - Construction of playgrounds and sports fields, swimming pools, etc.
Since July 1, 2023
Main activity: 43.11001 - Demolition of buildings and other constructions
Since July 1, 2023
Main activity: 43.120 - Site preparation works
Since July 1, 2023
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc.
Since July 1, 2023
Main activity: 43.12011 - Clearing of building sites
Since July 1, 2023
Main activity: 43.130 - Test drilling and surveys
Since July 1, 2023
Main activity: 43.21102 - Installation of telecommunication systems and computer facilities
Since July 1, 2023
Main activity: 43.221 - Plumbing works
Since July 1, 2023
Main activity: 43.22101 - Installation in buildings or other structures of: plumbing and sanitary facilities, pipes, gas and water connections (except for heating), installation of automatic fire extinguishing systems, etc.
Since July 1, 2023
Main activity: 43.222 - Installation of heating, ventilation and air conditioning
Since July 1, 2023
Main activity: 43.22201 - Installation in buildings or other construction projects of: heating systems, electricity, gas and oil-fired boilers, ventilation and air conditioning material and ducting, etc.
Since July 1, 2023
Main activity: 43.29101 - Implementation in buildings or other construction projects of: thermal insulation, acoustic and anti vibration insulation
Since July 1, 2023
Main activity: 43.320 - Joinery works
Since July 1, 2023
Main activity: 43.32001 - Assembly of exterior and interior joinery: doors, windows, staircases, fitted kitchen cupboards shop fittings, door and window frames, etc.
Since July 1, 2023
Main activity: 43.32002 - Assembly of wooden or plastic mobile walls; lining walls, ceilings etc.
Since July 1, 2023
Main activity: 43.32003 - Assembly of wooden or plastic garage doors, shutters, blinds, fences, gates etc.
Since July 1, 2023
Main activity: 43.32004 - Assembly of wooden or plastic armoured doors and firewall doors
Since July 1, 2023
Main activity: 43.32005 - Assembly of wooden or plastic greenhouses, verandas etc.
Since July 1, 2023
Main activity: 43.32011 - Assembly of external and internal metal joinery: doors, windows, door and window frames, staircases, fitted kitchen cupboards, shop fittings, etc.
Since July 1, 2023
Main activity: 43.32012 - Assembly of metal mobile walls; lining walls, ceilings, etc.
Since July 1, 2023
Main activity: 43.32013 - Assembly of metal garage doors, shutters, blinds, fences, gates, etc.
Since July 1, 2023
Main activity: 43.32014 - Assembly of metal armoured doors and fire doors
Since July 1, 2023
Main activity: 43.32015 - Assembly of metal greenhouses, verandas, etc.
Since July 1, 2023
Main activity: 43.32016 - Assembly of exterior and interior plastic joinery
Since July 1, 2023
Main activity: 43.32021 - Installation of glass interior doors, partition walls, etc.
Since July 1, 2023
Main activity: 43.332 - Fitting of wood coverings for floors and walls
Since July 1, 2023
Main activity: 43.33201 - Fitting in buildings or other construction projects of: parquet and other wood floors, wooden wall coverings
Since July 1, 2023
Main activity: 43.333 - Wallpapering and wall and floor coverings in other materials
Since July 1, 2023
Main activity: 43.33301 - Wallpapering
Since July 1, 2023
Main activity: 43.341 - Painting of buildings
Since July 1, 2023
Main activity: 43.34101 - Interior and exterior painting of buildings
Since July 1, 2023
Main activity: 43.342 - Painting of civil engineering works
Since July 1, 2023
Main activity: 43.34201 - Painting of metal frames
Since July 1, 2023
Main activity: 43.343 - Glaziery
Since July 1, 2023
Main activity: 43.34301 - Fitting of glass, mirrors, etc.
Since July 1, 2023
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work
Since July 1, 2023
Main activity: 43.39002 - Other building completion and finishing work n.e.s.
Since July 1, 2023
Main activity: 43.992 - Restoration of façades
Since July 1, 2023
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors
Since July 1, 2023
Main activity: 43.993 - Construction of decorative fireplaces and open fireplaces
Since July 1, 2023
Main activity: 43.994 - Masonry and repointing
Since July 1, 2023
Main activity: 43.99401 - Masonry
Since July 1, 2023
Main activity: 43.99402 - Execution of repointing
Since July 1, 2023
Main activity: 43.995 - Building restoration works
Since July 1, 2023
Main activity: 43.99901 - Establishment of foundations, including pile driving
Since July 1, 2023
Main activity: 43.99902 - Formwork and rebar work
Since July 1, 2023
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work
Since July 1, 2023
Main activity: 43.99905 - Execution of lifting work for third parties
Since July 1, 2023
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms
Since July 1, 2023
Main activity: 81.300 - Landscape service activities
Since July 1, 2023
 
 

(1)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.