Establishment unit data
In general | |||||
Enterprise number: | 0828.618.639 | ||||
Status of the entity: | Active | ||||
Number of the establishment unit: | 2.270.562.736 | ||||
Status of the establishment unit: | Active | ||||
Start date: | January 1, 2018 | ||||
Name of the establishment unit: |
MJ Soudure Name in French, since January 1, 2018 | ||||
Address of the establishment unit: |
Rue des Héros 11
7090 Braine-le-Comte Since January 1, 2018 | ||||
Phone number: |
| ||||
Fax: | No information found in the CBE. | ||||
Email address: | No information found in the CBE. | ||||
Web address: | No information found in the CBE. | ||||
| |||||
Authorisations | |||||
No data included in CBE. | |||||
| |||||
Version of Nacebel codes for activities 2008(2) | |||||
Main activity: 25.30003 - Design, construction and installation of piping systems, comprising further processing of tubes generally to make pipes or pressurized networks Since January 1, 2018 | |||||
Main activity: 31.010 - Manufacture of office and shop furniture Since January 1, 2018 | |||||
Main activity: 31.099 - Manufacture of other furniture n.e.c. Since January 1, 2018 | |||||
Main activity: 42.211 - Construction of water and gas distribution networks Since January 1, 2018 | |||||
Main activity: 42.212 - Construction of drainage systems for waste water Since January 1, 2018 | |||||
Main activity: 42.21901 - Drilling and water well construction, shaft sinking Since January 1, 2018 | |||||
Main activity: 42.21912 - Construction of networks to transport gas, petroleum products, etc. Since January 1, 2018 | |||||
Main activity: 42.91905 - Construction of settling ponds and other structures for waste water treatment Since January 1, 2018 | |||||
Main activity: 43.12001 - Earthworks: excavation, landfill, levelling of construction sites, trench digging, rock removal, blasting, etc. Since January 1, 2018 | |||||
Main activity: 43.12003 - Lowering of the water table and drainage of construction sites Since January 1, 2018 | |||||
Main activity: 43.12011 - Clearing of building sites Since January 1, 2018 | |||||
Main activity: 43.130 - Test drilling and surveys Since January 1, 2018 | |||||
Main activity: 43.291 - Insulation works Since January 1, 2018 | |||||
Main activity: 43.299 - Other installation works n.e.c. Since January 1, 2018 | |||||
Main activity: 43.39001 - Cleaning of new buildings and rehabilitation of sites after work Since January 1, 2018 | |||||
Main activity: 43.99201 - Steam cleaning, sand blasting and similar activities for building exteriors Since January 1, 2018 | |||||
Main activity: 43.99904 - Installation of steel structure elements not manufactured by the unit carrying out the work Since January 1, 2018 | |||||
Main activity: 43.99905 - Execution of lifting work for third parties Since January 1, 2018 | |||||
Main activity: 43.99906 - Assembly and disassembly of scaffolding and work platforms Since January 1, 2018 | |||||
Main activity: 81.210 - General cleaning of buildings Since January 1, 2018 | |||||
Main activity: 81.220 - Other building and industrial cleaning activities Since January 1, 2018 | |||||
Main activity: 81.22003 - Chimney sweeping and cleaning of hearths, furnaces, boiler incinerators, ventilation ducts and smoke evacuation devices Since January 1, 2018 | |||||
Main activity: 81.300 - Landscape service activities Since January 1, 2018 | |||||
Main activity: 90.031 - Artistic creation, except support activities Since January 1, 2018 |
|
(1)Address data and contact data have been divided from each other. Due to this change it is possible that the start date of the contact data is not correct. For more information, click here.
(2)The EC-classification of the Nacebel codes has changed on 1/1/2008. Both the Nacebel codification of 2003 and 2008 are available in Public Search. The 2003 codes were valid until 31/12/2007. On 1/1/2008, the new codification became valid. This was a mere administrative conversion : no activities of the entity or establishment unit have thus been changed.